|

OUR LIFE IN CHALABRE:

An American Expat in
the South of France
|
WORK BEGINS
ON MOM'S HOUSE
(June 2008)
After much delay, work finally begins on Mom's house. She will move to the ground floor apartment, which is being
completely renovated; we're also having the roof partially redone, and demolisahing the former attic to turn it
into a spacious 3rd floor apartment with mezzanine.
The Artesans of Chalabre
(Gabriel Chevalley, Christian Drouin, Emmanuel Montoro, Stephane Montoro and Michael Padet) are on the job.
|
The front of the house before work began
|
The scaffolding has been erected
|

The new door and front window have been installed
|
|

The timbers for the new roof are being lifted up
|

Front room: future living room
|
Middle room: kitchen on the right
|
|

Middle room: entrance to the cellar and dining on the left
|

Back room: bedroom, and bathroom (to the right)
|

Reverse view: from the bedroom to the front room.
|
UPDATE: MOM MOVES IN!
|